Fig. 8

thumbnail

Download original image

Measured (black) and modelled (blue) GIC at the Russian substation Vykhodnoy on 15 March 2012. A two-layer conductivity model is used as explained in the text.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.