Fig. 1

Download original image
(a) Location of the three UK geoelectric measurement systems. (b) LEMI 701 electrodes on test. (c) Map of geoelectric probe locations at Hartland observatory. (d) Stackplot of North–South (NS) component of the geoelectric field at Hartland for June 2013 showing a clear M2 (lunar) tidal periodic signal with peak to peak variation of around 20 mV/km.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.