Fig. 12

Download original image
Comparison of the density structures, the position of the HCS, and the squashing factor. The top left panel shows the WL map obtained on March 20th and the selected SMB with our technique. The two right panels show the density at 0.1 au obtained with Multi-VP and WP-AW, with the actual HCS in red for CR 2202. The projected trajectory of Earth is plotted in blue. The bottom left panel is the logarithm of the squashing factor of the WP-AW simulation.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.