Figure 6
Download original image
Visualization of the MIGRAS products for the Mother’s Day geomagnetic storm on May 10, 2024. Panel a shows an electron density map derived from the EFI Level 1b input data of Swarm A and C, while panel d displays a VTEC map created from the Level 2 TEC product of the satellites. The Swarm spacecraft, during their descending orbits, had an equatorial pass at around 19:11 LT. The 95th-percentile metrics of NeGIX (panels b and c) and TEGIX (panels e and f) are shown for their zonal and meridional components.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.
